Grading and Enabling Works at Al Fujairah International Airport

Fujairah - United Arab Emirates

Project Overview

The Enabling Works (Phase 1) scope of work includes design and construction of:

  • Site Clearance.
  • Rough grading and compaction of the area for the future parallel taxiway/emergency runway; cross field taxiways (1. No.), 900m runway extension to the existing runway and connection taxiway link, new ATC Tower and Client/ PMO office site.
  • Construction road, security patrol perimeter road, crash roads and access roads to the planned Client/ PMO office and the Air Traffic Control Tower fencing.
  • Establishment of construction road utilising the existing Crash Gate No.5.
  • Relocation and establishment of crash roads to/from Crash Gates No. 6 and 4.
  • Establishment of temporary security fence for construction including provision of Crash Gates.
  • Client/ PMO site office including furnishing, utility connections, maintenance and operation.
  • Protection and relocation of utility networks including water, electricity, communications and any other existing utilities within the FIA boundaries.
  • Protection of existing and proposed NAVAIDs.
  • Establishment of a construction site office.

Fujairah International Airport (FIA) / Abu Dhabi Airports Company (ADAC)

U.A.E Local Company

Al NISR Roads and Building Contracting L.L.C