Design & Construction of Aircraft Apron Phase-2 at Etihad Airways - Al Nisr

Our Projects

Design & Construction of Aircraft Apron Phase-2 at Etihad Airways

Abu Dhabi International Airports - UAE

Project Overview

Design & Construction of Concrete Apron Extension Phase-2 at Etihad Airways

 

  • Design of Concrete Pavement, Storm Water, Side Slope Protection & Engineering Works
  • Approvals of NOCs, PTW, AWAC, and GCAA AMC59 Compliance
  • 400mm thick Concrete Pavement for the Aircraft Apron including all associated works by using a Slipform Paver Machine
  • Supply and Installation of Flood Lights
  • Supply and Installation of AOA fence
  • Drain Channel / Storm Water Network
  • Side Slope Protection
  • Underground Utilities

Etihad Airways Engineering

Al Nisr Roads & Building Contracting L.L.C